Giant (Kunshan) Wastewater Treatment Project
Giant (Kunshan) Wastewater Treatment Project

Contact Our Experts:

Product Details


Giant (Kunshan) Co., Ltd. specializes in the production of bicycles and accessories. The river water purification project builds a water plant with a production capacity of 1500m3/d (designed to operate for 10 hours per day and produce 150 m3/hr), using river water to prepare production process water. The comprehensive wastewater generated is 1440m3/d, with a discharge of 720m3/d, which is treated and reused. *The large processing capacity can reach 2400 m3/d, including 720m3/d of discharge and 1680m3/d of reuse

Total amount of wastewater: 2400m3/d

Reuse ratio: 1680m3/d (70% of total water volume)

River water purification: 1500m3/d